COMPLETED PROJECTS
Linear construction objects of "NEFTGAZMONTAJ" LLC
The expansion of the gas transmission pipeline "Gazli - Nukus 1 thread 0 - 66 km". Diameter of 1220mm, length of 66km. (2004)
The construction of the gas transmission pipeline "Gazli - Kagan site km 0 – 10, 78 – 116 km". Diameter of 1020mm, length of 48km. (2005 – 2006)
The construction of the gas transmission pipeline "Bukhara - Ural" km 472 – 507, km 507 – 550. Diameter of 1020mm, general length of 78km. (2005 – 2006)
The construction of the gas transmission pipeline "Gazli - Sarimay" site 0 – 56, 56 – 103. Diameter of 1220mm, length of 103km. (2006 – 2007)
The construction of the gas transmission pipeline "Gazli - Nukus" km 66 – 106, 106 – 161km; 95 – 250km. Pipe diameter of 1220mm, general length of 250km. (2007 – 2009)
Construction of two underwater cabling through the Amu Darya River, by horizontal directional drilling method, with the length of 850 m long each. The pipe diameter is 1020mm. (2008-2009)
The construction of the gas transmission pipeline "SAS – IV luping" site 177,5 – 265,1km; 105 – 151,2km. Pipe diameter of 1420mm, general length of 133,8km. (2008 – 2009)
The construction of the gas transmission pipeline "SAS – II" km 0 – 78. Pipe diameter of 1220mm, length of 78km. (2008 – 2009)
Utilization of produced gases at the "Kokdumalak" field, second stage. (2005-2006)
Construction of «UPBS - Shurtan» (2006-2007)
Utilization of produced gases at the "Kokdumalak" field, third stage. (2008-2009)
Field facilities construction of "Severny Nishan", "Bishkek Kamashi", "Severny Guzar" (2007-2008)
Construction of a booster compressor station "DKS Gazli", five compressor units with a capacity of 25 MW each. (2008)
Construction of the gas transmission pipeline "Uzbekistan-China". The pipe diameter is 1067 mm, the length is 350 km. (2008-2009)
Reconstruction and replacement of separate sections of the gas pipeline "Gazli-Nukus" km 159 / 0-21. (2010)
Reconstruction of the second line of the Zirabulak-Gallyaral main gas pipeline (2012-2013)
Construction of the Uzbekistan-China gas pipeline line III (2013-2014)
Construction of the Kungrad-Ustyursk GCC industrial water pipeline with a branch to the Kungrad soda plant (2013-2016)
Construction of the BCS Gazli to replace the existing BCS -2.1 KC-0, BCS - 3, BCS -4 (STAGE II) Gas drying 2013-2014-2014г.
Construction of the gas pipeline Sokh - Namangan crossing via the river Syrdarya part. 55-56 km 201-2016.
Construction of pipelines at the Kandym gaz field in 2013-2016
Construction of BCS Southern Kemachi 2014-2016.
Construction of a gas pipeline with a DN 1020 mm of crude gas from “Surgil” gas processing plant to Ust. GCC L=108 km, condensate pipeline DN 168 mm from the “Surgil” gas processing plant to the Ust. GCC L=108 km, gas pipeline 0,720 mm of commercial gas from the Ust. GCC to “Akcholok” L=7,188 km 2014-2016.
Dismantling of the inactive “Bukhara-Ural” 3-line gas pipeline site 787-832 km. 2014-2016
Construction of additional lines of the Gasli-Nukus main gas pipeline -I, II line for 91-93 km to the Bukhara-Ural MG-I, II line for 307-327 km with installation of the Urgench-2 and Beruniy-2 GRS 2014 - up to the present day.
Artificial reservoir of the reserve technical water supply of the “Ustyurt” Agricultural Complex for 2.1 million m3 " 2014-2016.
Expansion of the existing “Surgil” CGTP 4-line 2015 -2016.
Industrial water pipe Ø 1020 mm. “Takhiatash-Kungrad" length-L=25.2 km " 2015-2017.
Construction of a gas pipeline connecting the Shurtan Syrdarya MG to the Yangier, Shirin GDP, Syrdarya TPP 2016 - up to the present day.
"Reconstruction of the “Khavas-Ferghana” II-line gas pipeline from 0-17km (exit KS-3B Yangier)" 2017 - up to the present day.
Construction of the GPP complex and development of the “Kandym” group of fields in 2017
Construction of the “Navoi - Kanimeh – Misken” railway crossing through 1,2,3 lines of the Uzbekistan-China gas pipeline 2017.
Construction of the “Bukhara – Misken” railway crossing through the Uzbekistan-China gas pipelines 2017.
Construction of the 4th line of the propane-butane mixture production unit at “Mubarek Gas Processing Plant” LLC 2017-2020.
Field facilities construction “Beskala” field development 2017.
Compensation of outgoing capacities. Desulfurization units No. 19,20,21 at LLC "Mubarek” MGPP 2017.
Development of the “Chandyr” group of fields with the construction of a gas pipeline from the “Chandyr” field to the Southern Kemachi gas processing complex 2017.
Replacement of MG Gazli-Chimkent D720mm by D1220mm L=29km 2018
Development of hydrocarbon fields of “Uzbekneftegazdobycha” JSC in 2018 - up to the present day
Construction of the 4th (reserve) technological line at the “Sharkiy Berdakh” CGTU 2018-2019.
Construction of the collector from Arslan and Inam g/s to “Sharkiy Berdakh” CGTU 2018-2020.
"Modernization of the existing Gazli-Kagan site 27-78 km MG with replacement of 720mm pipes by 1020mm pipes ( I and II stages)" 2019-2020.